All questions

Lean Bronze Certification Practice Exam

Browse all practice questions for the Lean Bronze Certification Practice Exam. Search by topic, open any question and review its full explanation, then test yourself in the practice quiz.

Lean Bronze Certification Exam Prep 2026 - Complete Practice Test course image
All questions

These questions are part of the practice quiz. Start practicing

  • The goal of Hoshin Kanri is
  • The takt time number means:
  • Which 5S step is described by 'Keep workplace neat and clean'?
  • What is the first step to cellularizing a production line?
  • Which company created the first moving assembly line?
  • In Sustain, visual cues provide:
  • Which statement about takt time is true?
  • Which option is listed as a Lean waste under the concept of Knowledge Disconnect?
  • Which PDCA phase is used to assess results after an improvement cycle?
  • Lean techniques define value from the perspective of whom?
  • A tool used to implement a pull system is:
  • Which term describes leveling production to smooth out volume and mix in kanban systems?
  • What method supports Sustain?
  • Sustain includes establishing systems for:
  • In which element is Takt Time commonly included?
  • In lean process analysis, which term describes unevenness in work and demand flow?
  • Which statement best defines value-added work in a lean system?
  • If Sustain is not practiced, gains tend to:
  • What is a Kaizen event typically used for?
  • If Availability is 100%, Performance is 100%, and OEE is 90%, what is the Value Stream Quality percentage?
  • Which statement best reflects the relationship between Kaizen and Kaikaku?
  • Pitch equals takt time times pack-out quantity.
  • A manufacturing plan with a high level of Muri indicates what about the workers?
  • What are the three elements of standard work in lean production?
  • In TPM, which is an example of a hidden failure?
  • Which element is described as foundational in lean systems?
  • Kaizen is a Japanese word meaning "change for the good", or continuous improvement. Which process best describes kaizen?
  • Which of the following is not a lean waste?
  • Which term is commonly used for a small cross-functional team formed to tackle a specific problem quickly?
  • Standardizing and stabilizing the process are necessary steps:
  • In a production line, a common sign of a bottleneck is
  • A visual management system in Sustain helps by:
  • Lean manufacturing is derived from the TPS; the fundamental concept behind lean manufacturing is the elimination of?
  • Catch ball is typically deployed in which process?
  • Which diagram is commonly used to analyze the flow of people and materials in a facility?
  • Which cycle is associated with the Deming philosophy and is cited in Lean as a core improvement loop?
  • In a process with a takt time of 3 minutes and a pack-out quantity of 35 parts, the Pitch is
  • In a lean system, who should establish production standards?
  • Sustain is primarily about preventing backsliding by:
  • Which statement best describes standardized work?
  • Who are pioneers of Just in Time techniques in Toyota?
  • Sustain ensures that improvements are:
  • What is the ultimate goal of lean?
  • Calculate the availability component of OEE using the data: Scheduled to run 16 hours a day, 5 days a week; Planned stop production 60 min each day for 5S activities; Lost 3 hours this week due to machine breakdowns; Lost 2 hours this week due to material shortages.
  • In 5S, the Red Tag area is used to identify items that are
  • In value stream mapping, who defines value at the outset?
  • Which tool is described as helping to understand the different value streams in lean systems?
  • In a 5S program, red tagging is used to
  • Which statement about takt time is true?
  • Little's Law states that WIP equals what combination of Throughput and Lead Time?
  • Which term refers to the set of actions that move a product through the essential flows, including both value-added and non-value-added steps?
  • Which method determines the optimal number of workers by aligning work with the line's flow?
  • What is the primary objective of Poka-Yoke?
  • Among the seven wastes, which is considered the worst?
  • In lean Manufacturing, which term describes fluctuations in process performance (uneven)?
  • Batch processing creates which of the following?
  • One-piece flow in Lean refers to which production approach?
  • Which lean practice is specifically concerned with reducing downtime during transitions between products?
  • Gemba in lean thinking refers to the what?
  • Which 5S term corresponds to standardizing processes?
  • In lean thinking, which statement best captures the relation of stability?
  • What term describes the practice of a downstream process going to the upstream process to retrieve product?
  • The amount of time it takes to complete one piece at a process step is known as
  • Which Lean term refers to waste from unnecessary motion, inventory, and processing steps?
  • Which Lean process is designed to align resources and strategic goals across the organization?
  • Given a takt time of 180 seconds and cycle times of 160s (Cutting), 190s (Deburring), 192s (Inspecting), and 194s (Packing), which process is the bottleneck?
  • Making parts just in case is an example of which Lean waste?
  • Management by walking around is most closely related to which concept?
  • Time study and standardized work is based on the work of whom?
  • The amount of stock kept on hand to compensate for variation in supplier lead time and upstream processes is known as:
  • In evaluating Overall Equipment Effectiveness, which item is not considered in the calculation?
  • Sustain requires that standard work be:
  • Which of the following is a direct consequence of batch processing in manufacturing?
  • Which theory describes the relationship between WIP, throughput, and lead time?
  • Takt time is the rate at which a product must be produced to meet customer demand.
  • What is the primary focus of Kaizen?
  • What is described as the basis of the Toyota Production System in the provided material?
  • With 960 minutes of available time, demand 200 units, and an OEE of 85%, what is the takt time?
  • Which activity best supports Sustain?
  • Which is an enabler of a lean culture?
  • Leadership must protect the working environment and the health and safety of all employees, in order to maintain respect. What is NOT included in assuring a safe environment?
  • Learning to See is widely regarded as the foundation of which lean tool?
  • If a multi-step manufacturing process has its capacity limited by a single workstation, which action most directly increases overall capacity?
  • Given a shift of eight hours with 20 minutes breaks, process time 1 minute, setup 15 minutes, and an interval of 60 parts, what is the capacity?
  • What is the first step when creating a value stream map?
  • Which problem-solving process is most commonly associated with Six Sigma?
  • What is the foundation of Toyota's House of Lean?
  • A physical device that prevents an operator from installing a component in the wrong orientation is an example of which concept?
  • To improve end-to-end flow, which should be identified and mapped?
  • Which of the following is the reason for the standardization of a process?
  • What should you expect from a SMED (single minute exchange of dies) implementation?
  • Which of the following are characteristics of craft manufacturing?
  • Sustain metrics often include:
  • Which of the following is a Japanese management philosophy used to increase time between failure of a piece of machinery?
  • In a Sustain-focused review, you should examine:
  • Which statement best describes the purpose of a Value Stream Map in Lean management?
  • If takt time is 30 seconds and a process step has a cycle time of 22 seconds, how long is the waiting time per cycle at that step?
  • Which diagram, when eliminating barriers to flow, uses graphical symbols to depict the nature and flow of steps within a process?
  • Which statement best describes takt time?
  • Which term describes all actions required to move a product through the main flows?
  • Which of the following made Fordism unsustainable?
  • Quality at the source is a principle where quality is measured at every level of a process, not just at the endpoint. What would quality at the source impact?
  • What would a project team do during the 4th step of a 5S implementation? (self-discipline is last of 5s)
  • Which of the following is NOT defined by Muri, Muda, Mura?
  • Which 5S step corresponds to "Set in order"?
  • Which technique is used to determine the optimal number of workers by ensuring an even workload across tasks?
  • Which practice is least associated with Sustain?
  • Hour by hour charts are an example of which lean concept?
  • Which tool is used to drill down into the root cause by repeatedly asking 'why'?
  • If work-in-process is 10 pieces and cycle time is 2.5 days, what is the throughput rate?
  • Which term describes a radical change in lean improvements?
  • Quick changeover is a lean principle used to:
  • Takt time refers to:
  • For a process where takt time is 50 seconds and the pitch is the product of takt time and pack-out quantity, which option correctly states the pitch when the pack-out quantity is 1?
  • An effective Sustain plan includes:
  • Which waste could be corrected by pulling demand from the customer?
  • In a lean factory, who is responsible for developing work standards?
  • What is the primary goal of continuous flow in a production system?
  • Kanban is a tool to support:
  • What is the first step to identify waste on a selected production line according to lean principles?
  • Which 5S step is described by 'Keep needed items in the correct place to allow for easy and immediate retrieval'?
  • Which of the following is NOT a core element of the TPS?
  • Which principle used in lean would allow an employee to have autonomation?
  • Which lean concept is defined as automation with a human touch?
  • Which combination is listed as an enabler to separating man from machine?
  • A value stream is the entire sequence of work required to bring a product from what to delivery?
  • Which 5S step is described by 'Method by which sort, straighten, shine is made habitual'?
  • Which of the following is not considered one of the seven plus one wastes?
  • Which term describes incremental continuous improvement?
  • Which term describes measurements used to gauge problems and guide improvement in lean systems?
  • What is the primary purpose of safety stock in supply chain management?
  • Which lean analytical tool helps identify the root cause of a problem?
  • What is a key difference between mentoring and coaching?
  • Which Lean concept is used to level production to match demand?
  • Why did the first implementation of lean techniques by American automotive companies often fail?
  • What is the purpose of value stream performance analysis?
  • Which waste is identified as the 'Mother of all wastes' in lean thinking?
  • The description of employees from different areas coming together to complete a task or solve a problem is described as which type of team?
  • When you identify a bottleneck, the first step should be to
  • Which of the following is not typically listed as a Lean waste?
  • What is the primary purpose of mapping the value stream?
  • What term describes machines that automatically reveal problems?
  • Which Lean tool is designed to prevent human errors from causing defects?
  • Which term describes work performed by a person?
  • When using the Ishikawa (Fishbone) Diagram, potential causes are grouped by which categories?
  • For most unimproved processes, the proportion of value-added work relative to total activities is approximately:
  • Time that does not add value to the product but is part of the process is called
  • Which is NOT an element of an effective idea-management system?
  • An important part of a Lean culture is people development - which of the following is NOT an example of people development?
  • The heart and soul of a lean organization according to Masaaki Imai (Gemba Kaizen) is what?
  • Which maintenance philosophy aims to increase time between failures?
  • W. Edwards Deming is associated with what Lean tool or technique?
  • With a takt time of 180 seconds and cycle times of 160s, 190s, 192s, and 194s, what is the greatest waiting time?
  • Which statement about Hoshin Kanri is consistent with the material?
  • In a production line, pulling a cable to stop the line is an example of which visual control tool?
  • Which term is described as the foundation for stability in the House of Lean?
  • The system used for managing and ensuring the flow of production materials in a just-in-time production system is known as:
  • Which statement correctly describes the relationship between process stability and process capability?
  • Which statement is true about the objective of Just in Time in lean practice?
  • Which practice best supports reducing operator-to-operator variation?
  • Which Kanban signal specifies the kind and quantity of product the downstream process may pull?
  • Which statement describes the basis of the Toyota Production System based on the material?
  • For a single 8-hour shift with 20 minutes of breaks and a daily demand of 230 units, takt time is:
  • What is the name for an activity that is non-value added but necessary?
  • Which task is used to map the current state of the production process from start to finish?
  • A commonality between sports and work is the ongoing need for:
  • In the 5S methodology, which step is commonly associated with communication and training?
  • Lead Time is the total time from order to delivery.
  • Which 5S step is described by 'Keep needed items from unneeded items and eliminate the latter (Red tag area)'?
  • Which waste is described as the worst because it opens the door to other kinds of waste?
  • What term describes measurements used to gauge problems, set targets, study impact of improvements, check results, and adjust?
  • In 5S, what is the primary objective of Sustain?
  • Which are the Pillars of TPS?
  • Which tool is most appropriate for visualizing a process and identifying root causes?
  • Which item is considered the 8th waste in Lean's extended framework?
  • Which of the following are common causes of the waste of waiting?
  • Which statement about just-in-time concepts is true?
  • According to lean Production Simplified, what should we do instead of blaming people for failures?
  • Which of the following is NOT true about Hoshin Kanri?
  • Which of the following is NOT a way to describe Gemba?
  • To sustain gains, management should:
  • Which term describes producing only what is needed, when it is needed, to avoid excess inventory?
  • The purpose of Takt time is to:
  • From the ideas system perspective, which feature most supports sustained engagement?
  • In 5S, the activity 'Sort' primarily focuses on:
  • One of the foundations of the Toyota Production System is standardized work. Its purpose is to:
  • In its purest form, when items are processed and moved directly from one process to the next one piece at a time, it is known as:
  • Which description best defines Autonomous Maintenance in TPM?
  • OEE is typically calculated as the product of which three components?
  • In Lean, what signaling mechanism triggers replenishment in a pull system?
  • During the 5S sort phase where should we put items we don't think we need?
  • Which term describes the practice of making a production line adaptable to different products with minimal changeover?
  • In a Lean organization, whose responsibility is safety?
  • Which of the following is considered value-added work?
  • Which term represents the fundamental Lean concept that drives improvements by eliminating non-value-added activities?